Market Verticals
Home >> Market Verticals >> Corporate
Commercial Bank of Qatar - Doha, Qatar

Technomight supplied and installed a large LED Video-Wall Display measuring 5.12 Meters x 2.88 Meters at the Reception Lobby of the new Commercial Bank Plaza, Doha Qatar. In addition we are integrating various audio-visual systems throughout the bank.

Ooredoo - Retails Outlets at 20+ Locations - Doha, Qatar

TECHNOMIGHT has been contracted by Ooredoo for System Integration of various audio-visual technologies and displays at more than 20+ Ooredoo Technology Showrooms spread all over Qatar.

Scope includes:
Video walls
Touch Screens
Info Screens

Ooredoo Headquarters, West Bay - Doha, Qatar

Technomight was contracted for the turnkey design, supply, installation and commissioning of two large Video Wall Displays, one Auditorium, several Meeting Rooms, and a Video Conferencing Suite at their HQrs Building in West Bay. In addition we have installed AV systems in the Chairman's Room, Boardroom, and the Ooredoo Training Center in Abu Hammour.

Petrofac - Abu Dhabi/Sharjah, UAE

Technomight was awarded a turnkey contract for design, supply, installation, and commissioning of multiple complete audio-video systems for various meeting rooms at Petrofac's HQ.

The scope includes:
- Meeting room audio-visual systems
- Conference room audio-visual systems
- HD LED display video wall system.

QTEL NOC, Wadi Al Sail - Doha, Qatar

Technomight has been awarded the turnkey contract for the design, supply and installation of operator console for Qatar Telecommunications new Network Operations Control ( NOC ) Center at Wadi Al Sail, Doha. QTEL NOC is a state of the art facility and is a mission critical control center that requires 24/7 Operation.

Tornado Tower - Doha, Qatar

Technomight was chosen for ther design, supply and installation of Audio Visual Systems for the award winning Tornado Tower. A Video-wall system consisting of 8 multiple Displays was installed at the Reception Area. In addition cutting edge video conferencing and control systems have been installed in the Director's floor and Chairman's floor.